AutoNetUSA › Paul Miller Porsche › 2026 BMW M5 Base
2026 BMW M5 Base
Base · Touring
Price$120,995
Doc Fee$995
Price$121,990
Price excludes tax, title, registration. Doc fee shown above.
Establishing this vehicle’s Google entity
🛡️ NHTSA Safety ratings & Recalls ↓Pricing, availability, and equipment can change at any time. Please confirm all details directly with Paul Miller Porsche.
Specifications
Features & options
Driving Assistant ProfessionalTraffic Jam AssistantLane Change AssistantPartial Automated DrivingBMW Iconic Glow Kidney GrilleRear Manual Side Window ShadesFront Ventilated SeatsFront and Rear Heated SeatsInterior CameraParking Assistant PlusPower Front SeatsHeated Front SeatsNavigation System18 SpeakersAM/FM radio: SiriusXM with 360LRadio data systemAir ConditioningAutomatic temperature controlFront dual zone A/CRear air conditioningRear dual zone A/CRear window defrosterHead restraints memoryHeads-Up DisplayMemory seatPower driver seatPower steeringPower windowsRemote keyless entrySteering wheel memorySteering wheel mounted audio controlsAdaptive suspensionFour wheel independent suspensionSpeed-sensing steeringTraction control4-Wheel Disc BrakesABS brakesDual front impact airbagsDual front side impact airbagsEmergency communication system: BMW Assist eCallFront anti-roll barLow tire pressure warningM Compound Brakes with Red CalipersOccupant sensing airbagOverhead airbagPower adjustable front head restraintsRear anti-roll barPower LiftgateBrake assistElectronic Stability ControlExterior Parking Camera RearAuto High-beam HeadlightsDelay-off headlightsFully automatic headlightsPanic alarmSecurity systemSpeed controlAuto-dimming door mirrorsBumpers: body-colorHeated door mirrors
About this vehicle
Is this 2026 BMW M5 your perfect car? Contact Paul Miller Porsche to see this Carbon Black Metallic Base Touring available for $121990
Safety & Recalls2026 BMW M5 · U.S. DOT / NHTSA data
1 open recall campaign for this model — repairs are performed at no charge to the owner.
- ELECTRICAL SYSTEM · NHTSA 26V096000
📍 3419 US-46, Parsippany, NJ 07054, USA📞 (973) 287-4030
VIN-specific completion status is confirmed at the dealer.
Source: official NHTSA data · nhtsa.gov · model-level; ratings shown for the primary tested configuration.
