AutoNetUSA › Paul Miller Porsche › 2020 BMW M2 CS
2020 BMW M2 CS
CS · Coupe
Price$71,495
Doc Fee$995
Price$72,490
Price excludes tax, title, registration. Doc fee shown above.
Price and availability from Paul Miller Porsche’s own listing as of Oct 8 — vehicles can sell or move at any time; confirm final price and availability with the dealer.
Establishing this vehicle’s Google entity
🛡️ NHTSA Safety ratings & Recalls ↓Pricing, availability, and equipment can change at any time. Please confirm all details directly with Paul Miller Porsche.
Specifications
Features & options
Navigation System12 SpeakersAM/FM radio: SiriusXMAM/FM Stereoharman/kardon® Logic 7® Digital Surroundharman/kardon® SpeakersRadio Control USRadio data systemSiriusXM Satellite RadioAir ConditioningAutomatic temperature controlFront dual zone A/CRear window defrosterMemory seatPower driver seatPower steeringPower windowsRemote keyless entrySteering wheel mounted audio controlsAdaptive suspensionFour wheel independent suspensionSpeed-sensing steeringTraction control4-Wheel Disc BrakesABS brakesDual front impact airbagsDual front side impact airbagsEmergency communication system: BMW Assist eCallFront anti-roll barKnee airbagLow tire pressure warningOccupant sensing airbagOverhead airbagRear anti-roll barBrake assistElectronic Stability ControlExterior Parking Camera RearDelay-off headlightsFully automatic headlightsPanic alarmSecurity systemSpeed controlAuto-dimming door mirrorsBumpers: body-colorHeated door mirrorsPower door mirrorsSpoilerTurn signal indicator mirrorsApple CarPlay CompatibilityApple CarPlay Compatibility w/1 Year TrialAuto-dimming Rear-View mirrorBMW Assist eCallBMW TeleServicesConnectedDrive ServicesDriver door binDriver vanity mirrorFront reading lightsGarage door transmitterHands-Free Bluetooth & USB Audio ConnectionIlluminated entry
About this vehicle
Is this 2020 BMW M2 your perfect car? Contact Paul Miller Porsche to see this Hockenheim Silver CS Coupe available for $75990
Safety & Recalls2020 BMW M2 · U.S. DOT / NHTSA data
2 open recall campaigns for this model — repairs are performed at no charge to the owner.
- AIR BAGS · NHTSA 19V352000
- FUEL SYSTEM, GASOLINE · NHTSA 20V666000
📍 3419 US-46, Parsippany, NJ 07054, USA📞 (973) 287-4030
VIN-specific completion status is confirmed at the dealer.
Source: official NHTSA data · nhtsa.gov · model-level; ratings shown for the primary tested configuration.
