AutoNetUSA › Paul Miller BMW › 2027 BMW M3 Base
2027 BMW M3 Base
1 / 19 · ⛶ expand

2027 BMW M3 Base

Base · Sedan
MSRP$88,750
Doc Fee$995
Paul Miller Price$89,745
Price excludes tax, title, registration. Doc fee shown above.
Price and availability from Paul Miller BMW’s own listing as of Oct 10 — vehicles can sell or move at any time; confirm final price and availability with the dealer.
View at Paul Miller BMW →
Establishing this vehicle’s Google entity

Pricing, availability, and equipment can change at any time. Please confirm all details directly with Paul Miller BMW.

Specifications

Engine3.0L I-6 cyl
TransmissionManual
DrivetrainRWD
FuelPremium Unleaded
ExteriorAventurin Red Metallic
InteriorTartufo
BodySedan
Conditionnew
Stock #VFX43259
VINWBS13HJ09VFX43259

Features & options

Tires: 19\Galvanic ControlsAdaptive Full LED LightsLive Cockpit Pro with NavigationParking Assistant PlusDrive RecorderParking View with 3D ViewActive Park Distance Control with Side ProtectionHarman/Kardon Surround Sound SystemSiriusXM with 360L and 1 Year Trial SubscriptionWireless Device ChargingConnectedDrive ServicesBMW TeleServicesBMW Assist ECallFront Ventilated SeatsMoonroofCarbon Fiber TrimM Compound Brakes with Black CalipersM Shadowline LightsTransmission: 6-Speed ManualApple CarPlay and Android Auto CompatibilityPower Front SeatsLumbar SupportHeated Front Seats

About this vehicle

Is this 2027 BMW M3 your perfect car? Contact Paul Miller BMW to see this Aventurin Red Metallic Base Sedan available for $89745