AutoNetUSA › Paul Miller BMW › 2027 BMW M3 Base
2027 BMW M3 Base
1 / 19 · ⛶ expand

2027 BMW M3 Base

Base · Sedan
MSRP$103,900
Doc Fee$995
Paul Miller Price$104,895
Price excludes tax, title, registration. Doc fee shown above.
Price and availability from Paul Miller BMW’s own listing as of Oct 29 — vehicles can sell or move at any time; confirm final price and availability with the dealer.
View at Paul Miller BMW →
Establishing this vehicle’s Google entity

Pricing, availability, and equipment can change at any time. Please confirm all details directly with Paul Miller BMW.

Specifications

Engine3.0L I-6 cyl
TransmissionManual
DrivetrainRWD
FuelPremium Unleaded
ExteriorSpecial Order Color
InteriorKyalami Orange Black
BodySedan
Conditionnew
Stock #VFX48152
VINWBS13HJ05VFX48152

Features & options

Galvanic ControlsAdaptive Full LED LightsLive Cockpit Pro with NavigationParking Assistant PlusDrive RecorderParking View with 3D ViewActive Park Distance Control with Side ProtectionM Carbon Exterior PackageM Alcantara Steering WheelExtended Shadowline TrimM Driver's PackageHarman/Kardon Surround Sound SystemSiriusXM with 360L and 1 Year Trial SubscriptionWireless Device ChargingConnectedDrive ServicesBMW TeleServicesBMW Assist ECallHeated Front SeatsM Carbon Bucket SeatsPower Front SeatsCarbon Fiber TrimM Compound Brakes with Red CalipersM Shadowline LightsWheels: 18\M Drive ProfessionalTransmission: 6-Speed ManualApple CarPlay and Android Auto Compatibility

About this vehicle

Is this 2027 BMW M3 your perfect car? Contact Paul Miller BMW to see this Special Order Color Base Sedan available for $104895